Ornamental Plasterwork

    Skinners' Hall Great Hall Ceiling

    Giving the 1904 rag-and-stick ornamental ceiling of a Grade I listed City livery hall an extension of life as the Company moves towards its 700-year anniversary.

    Date

    June 2023 – August 2023

    Location

    Skinners' Hall, London

    Role

    Craftsperson, project manager

    Project type

    Restoration and repair

    The Worshipful Company of Skinners, Great Hall ceiling repair and re-enforcement

    Skinners' Hall is a Grade I listed building located in the heart of London, an awe-inspiring place filled to the brim with history and built on the historic foundations of the City. The privilege of attending such an important building, never mind being invited to work on the fabric, is one of the highlights of my career.

    Rebuilt in 1668 just after the Great Fire of London, the remains of the original hall which burnt down in the fire rest under the Courtroom. The Great Hall ceiling vaults over 15 metres high, 30 metres long and 15 metres wide. Constructed in 1904, it is a 'rag and stick' ornamental suspended ceiling.

    Due to the age of the ceiling the fibres within the hessian, or 'rag', were starting to deteriorate, causing cracks and some sagging of the ornamentation. JP Construction were instructed to give the ceiling an extension of life as the Company of Skinners moves towards its 700-year anniversary.

    As with all our restoration projects we assess the existing construction along with the materials used and techniques employed when it was first constructed, and strive to use only like-for-like materials to ensure maximum compatibility with the existing substrate.

    To continue and improve on the traditional rag and stick method, we had to clean the last 100 years of dust and dirt from the top side of the ceiling, re-enforce the lath ribs and re-hang the ceiling using our own rag and stick method, re-enforced with hessian dipped in fine casting plaster.

    The reproduction of the lost ornamentation section had to be carried out very slowly, as most of the pieces that collapsed completely disintegrated as they fell, meaning we had to use bits and pieces to make our initial mould. Using fine casting plaster we cast a repeat from our new mould to piece together the 'run' as would have been done originally; for the shoulders we utilised our newly fabricated running horse and ran the lengths on site before securing into place.

    There were numerous freehand repairs to holes, cracks, flowers and of course the ornamentation. The result was excellent. Not only is the ceiling ready to continue its life, but the repairs cannot be distinguished from the original. Another project successfully completed to the highest of standards. All methodologies used were instructed and checked by our IHBC surveyor, HBA.

    If you have a project like this that needs restoration or maintenance then please get in touch.

    Get in Touch

    Before and After

    Drag to compare

    A lost section of the oak leaf enrichment, and the same run recast and restored.

    Skinners' Hall Great Hall Ceiling — beforeSkinners' Hall Great Hall Ceiling — afterAfterBefore

    Gallery

    55 photographs from the project

    Talk to John

    Call 07943 600 490 or email john@jpbuilds.net, or browse the rest of the portfolio.